Maintenance
UPS Duration Test
Resolved Dec 11 at 05:30pm GMT
I will be performing a test of how long the UPS can last on battery power, which will include oort gracefully shutting down automatically. Once oort has shutdown, I will plug the UPS back into mains power, and start up oort again.
Shutdown time test
Resolved Dec 14 at 08:20pm GMT
I will be testing how long it takes for oort to shutdown.
UPS Duration Test Take 2
Resolved Dec 14 at 07:39pm GMT
This test was once again somewhat unsuccessful. The UPS seems to have shut off at 20%, unsafely killing power to all connected devices (oort, router and ONT). The UPS should have entered a "Low Battery" mode at 30%, which should have commanded oort to shutdown.
1 previous update
UPS Test
Resolved Jan 24 at 04:10pm GMT
Testing UPS Shutdown configuration, which requires putting the UPS on battery power and letting it run down to ensure safe shutdown of OORT.
Planned Power Cut
Resolved Jan 31 at 09:47am GMT
Northern Powergrid have cancelled the planned power cut at short notice. All services will remain online.