Maintenance
Planned Power Cut
Resolved Jan 31, 2025 at 9:47am UTC
Northern Powergrid have cancelled the planned power cut at short notice. All services will remain online.
1 previous update
UPS Test
Resolved Jan 24, 2025 at 6:10pm UTC
Testing UPS Shutdown configuration, which requires putting the UPS on battery power and letting it run down to ensure safe shutdown of OORT.
Shutdown time test
Resolved Dec 14, 2024 at 9:00pm UTC
I will be testing how long it takes for oort to shutdown.
UPS Duration Test Take 2
Resolved Dec 14, 2024 at 6:00pm UTC
This test was once again somewhat unsuccessful. The UPS seems to have shut off at 20%, unsafely killing power to all connected devices (oort, router and ONT). The UPS should have entered a "Low Battery" mode at 30%, which should have commanded oort to shutdown.
1 previous update
UPS Duration Test
Resolved Dec 11, 2024 at 7:30pm UTC
I will be performing a test of how long the UPS can last on battery power, which will include oort gracefully shutting down automatically. Once oort has shutdown, I will plug the UPS back into mains power, and start up oort again.