Incidents | Boxersteavee Incidents reported on status page for Boxersteavee https://status.boxersteavee.dev/ https://d1lppblt9t2x15.cloudfront.net/logos/e369b6d8da29a436ddbea706e0024819.png Incidents | Boxersteavee https://status.boxersteavee.dev/ en ISP Maintenance https://status.boxersteavee.dev/incident/991857 Tue, 04 Aug 2026 01:00:08 -0000 https://status.boxersteavee.dev/incident/991857#ef1fa892e6aa4b186a2682ea1396a2a48f29a998bf90476f29d6705c09a52e2d My ISP - Zen Internet - are performing maintenance between 02:00 and 06:00 on Tuesday 4th of August 2026, so disruption is expected during this time. Server Upgrades https://status.boxersteavee.dev/incident/868620 Fri, 10 Apr 2026 10:00:59 -0000 https://status.boxersteavee.dev/incident/868620#bf1a4ab4ceb3b8528ea706b44e471bf978a88f398ec55054d1fccd7c21708b3e Oort is getting a platform upgrade (CPU and Motherboard swap), as well as additional storage installed, so will be down for multiple hours whilst this upgrade is performed. Move Pi to UPS https://status.boxersteavee.dev/incident/727741 Sat, 20 Sep 2025 14:40:43 -0000 https://status.boxersteavee.dev/incident/727741#9e1a57c2afa5be705c215d4f44ae3d71677d3eeef67bbc58ed907396a4744175 Moving Pi to UPS, which runs reverse proxy for jellyfin and others, also runs gallery.curiousphotos.co.uk (which may soon be deprecated or moved) Planned Power Cut https://status.boxersteavee.dev/incident/501336 Fri, 31 Jan 2025 09:00:58 -0000 https://status.boxersteavee.dev/incident/501336#91813cf4a3c667e6dcd2b588388954072017fb7c64bd6cdd238d0f2b8b2a2df9 Northern Powergrid are performing maintenance which requires house power to be off for multiple hours. Power is expected to be turned off at 9:30 and be back on by 14:30 UPS Test https://status.boxersteavee.dev/incident/501335 Fri, 24 Jan 2025 16:10:04 -0000 https://status.boxersteavee.dev/incident/501335#bf740a2152433c4cecd422452837173b68bbbab228c35d708faf067fc065937a Testing UPS Shutdown configuration, which requires putting the UPS on battery power and letting it run down to ensure safe shutdown of OORT. Shutdown time test https://status.boxersteavee.dev/incident/477739 Sat, 14 Dec 2024 20:20:20 -0000 https://status.boxersteavee.dev/incident/477739#9515953c0785c2d9e84fcf063ffc5b39058e09e697aad2aa145c7aacf260a999 I will be testing how long it takes for oort to shutdown. UPS Duration Test Take 2 https://status.boxersteavee.dev/incident/477692 Sat, 14 Dec 2024 16:20:00 -0000 https://status.boxersteavee.dev/incident/477692#5a40d578df6c721d86147300b218eca16d2d0203545944240e89660ddadacdc3 Due to some configuration errors, the last UPS test was not successful. The UPS performed as it should but oort did not shutdown upon reaching low battery. After fixing the configuration issue, I am now running the test again. UPS Duration Test https://status.boxersteavee.dev/incident/476109 Wed, 11 Dec 2024 17:30:30 -0000 https://status.boxersteavee.dev/incident/476109#4d032aad59cf1dd4a3462f79272a85f92715876b5ba45f24321f4dccb7e630dc I will be performing a test of how long the UPS can last on battery power, which will include oort gracefully shutting down automatically. Once oort has shutdown, I will plug the UPS back into mains power, and start up oort again. RAM Upgrade https://status.boxersteavee.dev/incident/461026 Wed, 13 Nov 2024 20:30:36 -0000 https://status.boxersteavee.dev/incident/461026#b1ff7755180d8812b60c2f32da8f111380d59d6e42305d9f7358e33420cbf77d Oort will be getting a RAM upgrade, which will require all of its services to be offline throughout the upgrade. Once completed, there will be more headroom for more powerful services in the future. Changing Internet Service Providers https://status.boxersteavee.dev/incident/449557 Mon, 28 Oct 2024 08:00:00 -0000 https://status.boxersteavee.dev/incident/449557#a1a0119c16e2de15edf7df11ff4f074f773a29f9a32746992d74714cf8a8533d On Monday 28th October, my Internet Service Provider will change from Virgin Media to Zen. This involves having new gear installed, a fibre cable pulled through the drive, and then the internet connection started. This is also when Oort and Capella will move into the garage, where the new router will be, and be put under UPS power. This should allow much greater uptime in the future, with a much more stable, and much faster internet connection. The appointment for installation is between 8am and 1pm, and is expected to take 3 hours. Moving Oort and Capella to the garage after that install shouldn't take too long. Updates will be provided as things happen. Home Electrical Re-Wiring https://status.boxersteavee.dev/incident/446918 Sun, 20 Oct 2024 08:30:54 -0000 https://status.boxersteavee.dev/incident/446918#cbe6dae8e30b4ceda2babde6a9bac74fc8a2be4619961f246705f8a84e22570d Changing some MCBs and adding circuits to Circuit Breaker. House power will be off from 10am. All services should be restored by 5pm. Power Shut-off for adding more power to shed. https://status.boxersteavee.dev/incident/395104 Mon, 08 Jul 2024 09:20:00 -0000 https://status.boxersteavee.dev/incident/395104#294511f0dc966d49c309bd0408814434c7959da466cadccc0b212db7af8897cd All home services will be shutdown temporarily as the power will be off to add power to the shed. Drive swap and TrueNAS Reinstall on oort https://status.boxersteavee.dev/incident/394852 Sun, 07 Jul 2024 19:15:00 -0000 https://status.boxersteavee.dev/incident/394852#a24c75f2d0a10e4b4abb7bb214ba4aee6f61c93c866866b82a11feba21b1486f The boot drive for TrueNAS on oort will be changed, and TrueNAS will be reinstalled on the new drive. The new drive will go in place of a failing 2TB Hard Drive that was the temporary NAS until I got a 16TB HDD. The current boot drive will become some form of ZFS Cache/Backup space. Issue new certificate to north1.boxersteavee.dev https://status.boxersteavee.dev/incident/378334 Sun, 02 Jun 2024 15:30:00 -0000 https://status.boxersteavee.dev/incident/378334#729324215714bed6311338dae6878cbc8a43ecf4980017ebdd1aa9a408b39988 gallery.curiousphotos.co.uk and jellyfin may become unaccessible via HTTP during the time north1 is being issued a new certificate, as port 80 has to be moved over to the IP north1 is running on. The downtime should not last longer than 15 minutes, but may take longer. Both services should still be accessible over HTTPS Fix migration issues https://status.boxersteavee.dev/incident/321448 Fri, 02 Feb 2024 19:35:00 -0000 https://status.boxersteavee.dev/incident/321448#3cbe0c2f93387e6855d49ef50d042de9eb2fee29aa3bf1d536bf3a0239bf6947 Jellyfin is currently down, which is due to an issue with the new reverse proxy. The reverse proxy system will have to be taken offline temporarily whilst a fix is made. This will affect the gallery and Jellyfin. Changing npm and Jellyfin to a new host https://status.boxersteavee.dev/incident/320527 Wed, 31 Jan 2024 21:20:00 -0000 https://status.boxersteavee.dev/incident/320527#8b90d5b269e928db500b44005db1ba5619999a8c8a564e5010fbcfcd69abee20 I will be changing Nginx Proxy Manager to a new host, my TrueNAS server. All services relying on it will go offline, which includes the gallery, jellyfin, and all it's other stuff. Jellyfin is also being migrated to the new server in this time. When services are restored, everything should still be accessible the same way they were, with the same domain names. Setting up certbot on another server https://status.boxersteavee.dev/incident/308957 Fri, 05 Jan 2024 17:30:00 -0000 https://status.boxersteavee.dev/incident/308957#27a70efce90c26fa03118b6d63cbbc83b67fcc227db4c2856705fa0b8ca0588d Setting up certbot on another server which requires transferring port 80 to that server, taking offline my current main server. Reallocating Resources https://status.boxersteavee.dev/incident/245760 Mon, 14 Aug 2023 19:50:00 -0000 https://status.boxersteavee.dev/incident/245760#880e0b7e000fe06c3c00fc30757299afc6f77bd2e1cf71240e9789d3083d9fdb Maintenance completed Reallocating Resources https://status.boxersteavee.dev/incident/245760 Mon, 14 Aug 2023 19:35:00 -0000 https://status.boxersteavee.dev/incident/245760#a11c1361a58e55397a1c5a97c426c94df2b19645fc39e5d29dc5e124f0e106c5 Reallocating Server Resources as CapRover does not need all these resourced, reducing to 2 cores, 6GB from. from 3 cores, 18GB ram.